- Home
- All Courses
- Undergraduate
- Civil Engineering
- ETABS & SAFE: Basic to Advance
Curriculum
- 5 Sections
- 107 Lessons
- Lifetime
Expand all sectionsCollapse all sections
- ETABS Installation3
- Materialsগুগল ড্রাইভে সবগুলো ফাইল একসাথে জিপ আকারে রাখা আছে। ডাউনলোড করে এক্সট্রাক্ট করে নিতে হবে।1
- ETABS61
- 3.11. Introduction ETABS10 Minutes
- 3.22. Basic Discussion11 Minutes
- 3.33. Requirement for Dynamic Analysis5 Minutes
- 3.44. Structural Configuration Vertical Irregularity8 Minutes
- 3.55. Horizontal Irregularity7 Minutes
- 3.66. Design Code4 Minutes
- 3.77. Grid data, Story Data20 Minutes
- 3.88. Material Define6 Minutes
- 3.99. Frame Section Define7 Minutes
- 3.1010. Slab Section _ Wall Section4 Minutes
- 3.1111. Column Shear Wall Draw8 Minutes
- 3.1212. Beam Draw7 Minutes
- 3.1313. Slab Draw11 Minutes
- 3.1414. Stair Draw10 Minutes
- 3.1515. Assign Support, Pier, Spandrel5 Minutes
- 3.1616. Load Pattern, Floor Finish7 Minutes
- 3.1717. PW Load On Beam9 Minutes
- 3.1818. PW on Slab8 Minutes
- 3.1919. Water Load5 Minutes
- 3.2020. Live Load6 Minutes
- 3.2121. introduction of Earthquake4 Minutes
- 3.2222. Seismic Design Category9 Minutes
- 3.2323. Site Class by Excel4 Minutes
- 3.2424. Earthquake Load in ETABS19 Minutes
- 3.2525. Diaphragm _ Mesh5 Minutes
- 3.2626. Wind Load define in ETABS14 Minutes
- 3.2727. Mass Source, Load Case4 Minutes
- 3.2828. Load Combination for SDC,B_C14 Minutes
- 3.2929. Load Combination for SDCD5 Minutes
- 3.3030. Load Combination in ETABS8 Minutes
- 3.3131. Assign Stiffness or Property Modifier5 Minutes
- 3.3232. Check Model Run Analysis3 Minutes
- 3.3333. Serviceability Check7 Minutes
- 3.3434. Sway Check6 Minutes
- 3.3535. Torsional Irregularity Check5 Minutes
- 3.3636. Story Drift Check5 Minutes
- 3.3737. Soft Story Check3 Minutes
- 3.3838. P Delta Effect Check5 Minutes
- 3.3939. Assign Property Modifier4 Minutes
- 3.4040. Design 1st trial16 Minutes
- 3.4141. Fail Member Section Change6 Minutes
- 3.4242. 2nd _ 3rd Trial22 Minutes
- 3.4343. Last trial9 Minutes
- 3.4444. Column P-M-M Ratio Check17 Minutes
- 3.4545. Intermediate Detailing of Column9 Minutes
- 3.4646. Intermediate detailing Column tia Bar8 Minutes
- 3.4747. Special detailing Column tie Bar10 Minutes
- 3.4848. Intermediate detailing Beam(IMF)14 Minutes
- 3.4949. Special detailing Beam (SMF)5 Minutes
- 3.5050. SMF IMF Detailing of Beam Stirrup8 Minutes
- 3.5151. Introduction of Shear Wall13 Minutes
- 3.5252. Shear Wall Design in ETABS Longitudinal Reinforcement12 Minutes
- 3.5353. Shear Wall Boundary Element Design3 Minutes
- 3.5454. Shear wall Tie Bar Detailing3 Minutes
- 3.5556. Slab Design By ETABS14 Minutes
- 3.5655. Coupling Beam Design Detailing6 Minutes
- 3.5757. Two way slab design by USD Method According to BNBC 2020 – Two Way slab Design28 Minutes
- 3.5858. Uses of all Excel23 Minutes
- 3.5959. Preparing Autocad(.dxf) file Modeling by Autocad(.dxf) file23 Minutes
- 3.6060.ETABS Warning Horizontal Rigid diaphragm connection found between joint at different elevation solve7 Minutes
- 3.6161. Line Load is not transfer Warning Remove from ETABS – ETABS Model Check – ETBAS Model Warning Remove7 Minutes
- SAFE Installation2
- SAFE40
- 5.01. Basics of Foundation9 Minutes
- 5.12. Soil Test Report Study7 Minutes
- 5.23. BNBC Provision7 Minutes
- 5.34. Square Footing Design Part-117 Minutes
- 5.45. Square Footing Design Part-27 Minutes
- 5.56. Square Footing Design Part-310 Minutes
- 5.67. Square Footing Design Part-44 Minutes
- 5.78. Rectangular Footing Design Part-113 Minutes
- 5.89. Rectangular Footing Design Part-29 Minutes
- 5.910. Eccentric Footing design Part-16 Minutes
- 5.1011. Eccentric Footing design Part-29 Minutes
- 5.1112. Eccentric Footing design Part-311 Minutes
- 5.1213. Strap Footing Design Part-16 Minutes
- 5.1314. Strap Footing Design Part-210 Minutes
- 5.1415. Strap Footing Design Part-35 Minutes
- 5.1516. Strap Footing Design Part-411 Minutes
- 5.1617. Strap Footing Design Part-54 Minutes
- 5.1718. Strap Beam Design6 Minutes
- 5.1819. Combined footing design Part-112 Minutes
- 5.1920. Combined footing design Part-215 Minutes
- 5.2021. Combined footing design Part-310 Minutes
- 5.2122. Combined footing design Part-44 Minutes
- 5.2223. Introduction of MAT Foundation9 Minutes
- 5.2324. Mat Design part-27 Minutes
- 5.2425. Mat Design part-36 Minutes
- 5.2526. Mat Design part-45 Minutes
- 5.2627. MAT Design Part-58 Minutes
- 5.2728. MAT Design Part-612 Minutes
- 5.2829. MAT Design Part-710 Minutes
- 5.2930. MAT Design Part-87 Minutes
- 5.3031. Pile Foundation Part-16 Minutes
- 5.3132. Pile Foundation Part-27 Minutes
- 5.3233. Pile Foundation Part-35 Minutes
- 5.3334. Pile Foundation Part-43 Minutes
- 5.3435. Pile Cap Design part-14 Minutes
- 5.3536. Pile Cap Design Part-28 Minutes
- 5.3637. Pile Cap Design Part-37 Minutes
- 5.3738. Pile Cap Design Part-49 Minutes
- 5.3839. Pile Cap Design Part-510 Minutes
- 5.3940. Pile Cap Design Part-68 Minutes
39. Pile Cap Design Part-5
Prev